Penmann has completed a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://bookmark-template.com/story26535126/penmann-ltd-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2